You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
After cleaning up timing constraints and exclusions, the PD team noticed that further optimizations on the design are required for timing closure.
Reducing the number of PRINCE half rounds for the main SRAM scrambling back to the level in Earlgrey ES was identified as a way to ease this. From a security perspective, 5 full PRINCE rounds (instead of 7) have been found acceptable.
Since ES, we number of scrambling rounds have been adjusted using the following PRs:
I am closing this again as both the PR integrating this change into master (#24447) as well as the cherry-pick PR into the tapeout release branch (#24378) have been merged.
Description
After cleaning up timing constraints and exclusions, the PD team noticed that further optimizations on the design are required for timing closure.
Reducing the number of PRINCE half rounds for the main SRAM scrambling back to the level in Earlgrey ES was identified as a way to ease this. From a security perspective, 5 full PRINCE rounds (instead of 7) have been found acceptable.
Since ES, we number of scrambling rounds have been adjusted using the following PRs:
The text was updated successfully, but these errors were encountered: